Wednesday, 1 August 2007

More carpentry, more glass

31st July 2007 - We went up to our place and saw as promised, most of the carpentry stuff have been installed. It was a pleasant surprise to find that the glass works were done correctly this time. Oh have I mentioned that the glass supplier screwed up not once but twice? I guess I haven't, but I will blog about their mistakes in a separate entry after I upload the pics from my mobile, lol. Anyway, this time round we were quite satisfied with the glass works, though keeping our fingers crossed that the remaining glass works and mirrors would be done correctly!
Ok, here are the latest updates:



MBR TV feature wall


More work done to the WIW and tada! The connecting glass door between the MBR & WIW is up! Finally...lol.


Dresser mirror frame installed. Now waiting for the glass supplier to install the mirror in between!


Vanity cabinet for the MBR toilet is up~ Waiting for the glass top now.


Balcony glass door FINALLY positioned the way we want! One headache down~ :)


Same goes for the study's glass wall and door~ :)


Solid surface worktop is up too. Didn't expect the colour to be so errm...colourful (if only you can see the shiny flakes on it), but Hb likes it.


Common toilet's vanity cabinet done. Left glass top too~


TV console is up...but sad to say... it's not what we expected... hoping can re-do...


Shoe cabinet halfway done too....

Frankly speaking, I am not very satisfied with the way the carpentry turned out. Can see gaps in between the laminate joints but we were told the laminates we chose are thick, so can't be helped. But I really don't like it.... and I am not going to accept marker colouring as rectification!


- Phebe

No comments: