Friday, 14 February 2025

Aircon Overhaul and Repainting Walls

6 Feb 2025 - This the day we bade our 5-year old LG System 4 goodbye. It's a massive project that includes changing of trunking, piping, insulation, wiring...etc. We tried to cover up our furniture with plastic sheets as much as we could in the morning but the house was still super dusty. I banished myself to one corner of the sofa and binge-watched drama. Clara returned home at 4.30pm and I also banished her to sit on her chair in the LVR. We could not access anywhere else in the house, lol.




















I decided to escape to JP again and brought Clara along. We had dinner at Malaysia Boleh and C joined us after school. We got home at 8.30pm but the aircon was not done yet. Haiz, it will have to drag on to tomorrow. Started cleaning up after uncle left. Sooo messy and dirty. I tried cleaning the MBR and gave up. Luckily daddy can clean very well, wahahahhaa! 

7 Feb 2025 - Our aircon installation continued today and was done around 1.30pm. Thankfully it wasn't too dusty, phew! Now we have a System 1 for our MBR (15000 BTU) and a System 3 for the LVR (18000 BTU), study (9000 BTU) and kids' bedroom (9000 BTU). Dyson-ed the house 3 times throughout the day and cleaned some of the furniture that I felt got especially dusty yesterday. Furniture such as the wheels of our 4 study chairs, haha. So happy our new aircon is finally up and running. The final step would be to buy paint and paint parts of the walls that sustained ugly marks in the process.  













9-14 Feb 2025 -
Daddy repainted some walls over these few days. 










No comments: